Thornton Waste Recovery Park (Waste AD)
Thornton Waste Recovery Park (Waste AD) is operational in Wyre with a recorded capacity of 1.9 MW, and has been generating since 2010-05-01.
Planning and build timeline
| Application submitted | 2009-10-29 |
| Permission granted | 2010-01-28 3 months after submission |
| Operational | 2010-05-01 3 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — Wyre
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Jameson Road Landfill Gas · Operational | 4.3 | 0.9 km |
Fleetwood Water Treatment Works Solar Photovoltaics · Operational | 1.3 | 1.6 km |
Thornton Power Station Biomass (dedicated) · Operational | 9 | 1.8 km |
Land To The South Of Todderstaffe Solar Photovoltaics · Operational | 4.5 | 8.7 km |
Weeton Barracks, Grantham Road - Solar Panels Solar Photovoltaics · Under Construction | 0.7 | 9.4 km |
Orchard End Wind Onshore · Operational | 4 | 9.8 km |
Staining Wood Farm Solar Photovoltaics · Operational | 4.9 | 13.2 km |
Land off Moss Side Lane Solar Photovoltaics · Operational | 5 | 14.5 km |
How big is Thornton Waste Recovery Park (Waste AD)?
Thornton Waste Recovery Park (Waste AD) has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thornton Waste Recovery Park (Waste AD)?
REPD records the operator as Global Renewables Lancashire. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thornton Waste Recovery Park (Waste AD) approved and built?
The application was submitted on 2009-10-29. Permission was granted on 2010-01-28, 3 months later. The site became operational on 2010-05-01, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 223.