Thornton Waste Recovery Park (Waste AD)

Thornton Waste Recovery Park (Waste AD) is operational in Wyre with a recorded capacity of 1.9 MW, and has been generating since 2010-05-01.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-05-01
Anaerobic Digestion
Technology
Global Renewables Lancashire
Wyre
Authority
England

Planning and build timeline

Application submitted2009-10-29
Permission granted2010-01-28
3 months after submission
Operational2010-05-01
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Jameson Road
Landfill Gas · Operational
4.30.9 km
Fleetwood Water Treatment Works
Solar Photovoltaics · Operational
1.31.6 km
Thornton Power Station
Biomass (dedicated) · Operational
91.8 km
Land To The South Of Todderstaffe
Solar Photovoltaics · Operational
4.58.7 km
Weeton Barracks, Grantham Road - Solar Panels
Solar Photovoltaics · Under Construction
0.79.4 km
Orchard End
Wind Onshore · Operational
49.8 km
Staining Wood Farm
Solar Photovoltaics · Operational
4.913.2 km
Land off Moss Side Lane
Solar Photovoltaics · Operational
514.5 km

How big is Thornton Waste Recovery Park (Waste AD)?

Thornton Waste Recovery Park (Waste AD) has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Thornton Waste Recovery Park (Waste AD)?

REPD records the operator as Global Renewables Lancashire. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Thornton Waste Recovery Park (Waste AD) approved and built?

The application was submitted on 2009-10-29. Permission was granted on 2010-01-28, 3 months later. The site became operational on 2010-05-01, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 223.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council