Dewlay Cheese Wind Turbine
Dewlay Cheese Wind Turbine is operational in Wyre with a recorded capacity of 2 MW, and has been generating since 2010-11-01.
Planning and build timeline
| Application submitted | 2008-06-27 |
| Permission granted | 2008-09-04 2 months after submission |
| Operational | 2010-11-01 26 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Westfield Farm Solar Photovoltaics · Operational | 5 | 2.2 km |
Bilsborrow Solar Farm Solar Photovoltaics · Operational | 5 | 5 km |
Orchard End Wind Onshore · Operational | 4 | 5.4 km |
Weeton Barracks, Grantham Road - Solar Panels Solar Photovoltaics · Under Construction | 0.7 | 12.7 km |
Oakfield Farm - extension Solar Photovoltaics · Operational | 1.7 | 13 km |
Oakfield Farm Solar Photovoltaics · Operational | 5 | 13.1 km |
Lancaster University (wind) Wind Onshore · Operational | 2 | 13.2 km |
Land To The South Of Todderstaffe Solar Photovoltaics · Operational | 4.5 | 13.7 km |
How big is Dewlay Cheese Wind Turbine?
Dewlay Cheese Wind Turbine has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dewlay Cheese Wind Turbine?
REPD records the operator as Dewlay Cheese Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dewlay Cheese Wind Turbine approved and built?
The application was submitted on 2008-06-27. Permission was granted on 2008-09-04, 2 months later. The site became operational on 2010-11-01, 26 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3078.