Westfield Farm

Westfield Farm is operational in Wyre with a recorded capacity of 5 MW, and has been generating since 2016-01-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-15
Solar Photovoltaics
Technology
Hive Energy/ Vogt Solar
Wyre
Authority
England

Planning and build timeline

Application submitted2014-11-12
Permission granted2015-05-06
6 months after submission
Operational2016-01-15
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wyre’s record on solar

Wyre has decided 9 solar farms and approved 100%, taking a median of 4.3 months. See every solar farm decision in Wyre

Other built sites within 15 km

SiteMWDistance
Dewlay Cheese Wind Turbine
Wind Onshore · Operational
22.2 km
Bilsborrow Solar Farm
Solar Photovoltaics · Operational
53 km
Orchard End
Wind Onshore · Operational
47.3 km
Oakfield Farm - extension
Solar Photovoltaics · Operational
1.711.5 km
Oakfield Farm
Solar Photovoltaics · Operational
511.6 km
Brookhouse Mill
Solar Photovoltaics · Operational
0.312 km
Weeton Barracks, Grantham Road - Solar Panels
Solar Photovoltaics · Under Construction
0.713 km
Fell View Farm (Phase 2)
Solar Photovoltaics · Operational
2.913 km

How big is Westfield Farm?

Westfield Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Westfield Farm?

REPD records the operator as Hive Energy/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Westfield Farm approved and built?

The application was submitted on 2014-11-12. Permission was granted on 2015-05-06, 6 months later. The site became operational on 2016-01-15, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4887.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council