Jameson Road
Jameson Road is operational in Wyre with a recorded capacity of 4.3 MW, and has been generating since 2006-07-13.
Planning and build timeline
| Application submitted | 2003-06-16 |
| Permission granted | 2003-08-06 2 months after submission |
| Operational | 2006-07-13 35 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 5 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Fleetwood Water Treatment Works Solar Photovoltaics · Operational | 1.3 | 0.7 km |
Thornton Waste Recovery Park (Waste AD) Anaerobic Digestion · Operational | 1.9 | 0.9 km |
Thornton Power Station Biomass (dedicated) · Operational | 9 | 2.7 km |
Land To The South Of Todderstaffe Solar Photovoltaics · Operational | 4.5 | 9.6 km |
Orchard End Wind Onshore · Operational | 4 | 9.9 km |
Weeton Barracks, Grantham Road - Solar Panels Solar Photovoltaics · Under Construction | 0.7 | 10.3 km |
Staining Wood Farm Solar Photovoltaics · Operational | 4.9 | 14.2 km |
How big is Jameson Road?
Jameson Road has a recorded installed capacity of 4.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jameson Road?
REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jameson Road approved and built?
The application was submitted on 2003-06-16. Permission was granted on 2003-08-06, 2 months later. The site became operational on 2006-07-13, 35 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 708.