Renewable sitesJameson Road

Jameson Road

Jameson Road is operational in Wyre with a recorded capacity of 4.3 MW, and has been generating since 2006-07-13.

4.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-07-13
Landfill Gas
Technology
SITA UK
Wyre
Authority
England

Planning and build timeline

Application submitted2003-06-16
Permission granted2003-08-06
2 months after submission
Operational2006-07-13
35 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Fleetwood Water Treatment Works
Solar Photovoltaics · Operational
1.30.7 km
Thornton Waste Recovery Park (Waste AD)
Anaerobic Digestion · Operational
1.90.9 km
Thornton Power Station
Biomass (dedicated) · Operational
92.7 km
Land To The South Of Todderstaffe
Solar Photovoltaics · Operational
4.59.6 km
Orchard End
Wind Onshore · Operational
49.9 km
Weeton Barracks, Grantham Road - Solar Panels
Solar Photovoltaics · Under Construction
0.710.3 km
Staining Wood Farm
Solar Photovoltaics · Operational
4.914.2 km

How big is Jameson Road?

Jameson Road has a recorded installed capacity of 4.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Jameson Road?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Jameson Road approved and built?

The application was submitted on 2003-06-16. Permission was granted on 2003-08-06, 2 months later. The site became operational on 2006-07-13, 35 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 708.