Renewable sites › Fleetwood Water Treatment Works
Fleetwood Water Treatment Works
Fleetwood Water Treatment Works is operational in Wyre with a recorded capacity of 1.3 MW, and has been generating since 2015-03-15.
Planning and build timeline
| Application submitted | 2014-07-16 |
| Permission granted | 2014-11-21 4 months after submission |
| Operational | 2015-03-15 4 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wyre’s record on solar
Wyre has decided 9 solar farms and approved 100%, taking a median of 4.3 months. See every solar farm decision in Wyre →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Jameson Road Landfill Gas · Operational | 4.3 | 0.7 km |
Thornton Waste Recovery Park (Waste AD) Anaerobic Digestion · Operational | 1.9 | 1.6 km |
Thornton Power Station Biomass (dedicated) · Operational | 9 | 3.3 km |
Orchard End Wind Onshore · Operational | 4 | 10.1 km |
Land To The South Of Todderstaffe Solar Photovoltaics · Operational | 4.5 | 10.3 km |
Weeton Barracks, Grantham Road - Solar Panels Solar Photovoltaics · Under Construction | 0.7 | 11 km |
Staining Wood Farm Solar Photovoltaics · Operational | 4.9 | 14.8 km |
How big is Fleetwood Water Treatment Works?
Fleetwood Water Treatment Works has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Fleetwood Water Treatment Works?
REPD records the operator as United Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Fleetwood Water Treatment Works approved and built?
The application was submitted on 2014-07-16. Permission was granted on 2014-11-21, 4 months later. The site became operational on 2015-03-15, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5001.