Nowhere Farm

Nowhere Farm is operational in Boston with a recorded capacity of 8.1 MW, and has been generating since 2015-03-20.

8.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-20
Solar Photovoltaics
Technology
Estover Energy
Boston
Authority
England

Planning and build timeline

Application submitted2014-07-02
Permission granted2014-09-17
3 months after submission
Operational2015-03-20
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Boston’s record on solar

Boston has decided 14 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Boston

Other built sites within 15 km

SiteMWDistance
Kirton Solar PV Farm
Solar Photovoltaics · Operational
3.20.9 km
Fen Road
Solar Photovoltaics · Operational
1.45 km
Cowbridge Road, Bicker Fen - Battery Storage
Battery · Under Construction
507.1 km
Cowbridge Road, Bicker Fen - Solar Array
Solar Photovoltaics · Under Construction
757.1 km
Riverside Industrial Estate Gasification Plant
Advanced Conversion Technologies · Operational
10.57.1 km
Marsh Lane - Solar PV Panels
Solar Photovoltaics · Under Construction
0.897.2 km
Pinguin Foods
Solar Photovoltaics · Operational
1.57.2 km
Bicker Fen
Wind Onshore · Operational
26.77.7 km

How big is Nowhere Farm?

Nowhere Farm has a recorded installed capacity of 8.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nowhere Farm?

REPD records the operator as Estover Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nowhere Farm approved and built?

The application was submitted on 2014-07-02. Permission was granted on 2014-09-17, 3 months later. The site became operational on 2015-03-20, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2208.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council