Novarly ParcelRenewable sites

Renewable sitesFen Road

Fen Road

Fen Road is operational in Boston with a recorded capacity of 1.4 MW, and has been generating since 2014-07-22.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-22
Solar Photovoltaics
Technology
Lark Energy
Boston
Authority
England

Planning and build timeline

Application submitted2013-09-11
Permission granted2013-12-10
3 months after submission
Operational2014-07-22
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Boston’s record on solar

Boston has decided 14 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Boston

Other built sites within 15 km

SiteMWDistance
Pinguin Foods
Solar Photovoltaics · Operational
1.53.5 km
Marsh Lane - Solar PV Panels
Solar Photovoltaics · Under Construction
0.893.7 km
Riverside Industrial Estate Gasification Plant
Advanced Conversion Technologies · Operational
10.54.1 km
Kirton Solar PV Farm
Solar Photovoltaics · Operational
3.24.1 km
Boston Landfill, Wyberton - Solar PV Array
Solar Photovoltaics · Under Construction
9.75 km
Nowhere Farm
Solar Photovoltaics · Operational
8.15 km
Canopus Farm
Solar Photovoltaics · Operational
55 km
Boston Landfill Scheme
Landfill Gas · Operational
1.35.4 km

How big is Fen Road?

Fen Road has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fen Road?

REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fen Road approved and built?

The application was submitted on 2013-09-11. Permission was granted on 2013-12-10, 3 months later. The site became operational on 2014-07-22, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1367.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council