Northfield House Solar Farm

Northfield House Solar Farm is an operational 26 MW solar farm in Harborough, generating since 15 February 2023. Planning permission was granted on 25 November 2020, 3 months after submission. Operator of record: Lightsource BP.

26 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2023
Solar Photovoltaics
Technology
Lightsource BP
Harborough
Authority
England

Planning and build timeline

Application submitted24 August 2020
Permission granted25 November 2020
3 months after submission
Operational15 February 2023
27 months after consent

Screening a site of your own?

RedlineUK · £39

Harborough approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Northfield House Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Harborough’s record on solar

Harborough has decided 12 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Harborough

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.31.2 km
Solar Photovoltaics · Operational
18.32.9 km
Wind Onshore · Operational
224 km
Solar Photovoltaics · Under Construction
204.1 km
Wind Onshore · Operational
105.4 km
Wind Onshore · Operational
167.8 km
Wind Onshore · Operational
88 km
Solar Photovoltaics · Under Construction
49.99.8 km

How big is Northfield House Solar Farm?

Northfield House Solar Farm has a recorded installed capacity of 26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Northfield House Solar Farm?

REPD records the operator as Lightsource BP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Northfield House Solar Farm approved and built?

The application was submitted on 24 August 2020. Permission was granted on 25 November 2020, 3 months later. The site became operational on 15 February 2023, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13251.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode