Low Spinney Wind Farm is operational in Harborough with a recorded capacity of 8 MW, and has been generating since 2011-09-29.
Planning and build timeline
| Application submitted | 2009-02-11 |
| Permission granted | 2009-09-03 7 months after submission |
| Operational | 2011-09-29 25 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Harborough’s record on onshore wind
Harborough has decided 5 onshore wind schemes and approved 40%, taking a median of 3.9 months. See every onshore wind scheme decision in Harborough →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Blaby Solar Farm Solar Photovoltaics · Operational | 3.5 | 7.8 km |
Northfield House Solar Farm Solar Photovoltaics · Operational | 26 | 8 km |
Narborough Landfill Landfill Gas · Operational | 2.7 | 8.5 km |
Streetfield Farm Solar Photovoltaics · Operational | 18.3 | 8.6 km |
Cotesbach Landfill Gas Project Landfill Gas · Operational | 2.3 | 9.1 km |
Swinford Wind Farm Wind Onshore · Operational | 22 | 10.1 km |
A C Shropshire (Farm AD) Anaerobic Digestion · Operational | 2.5 | 10.1 km |
Swinford Wind Farm Solar Photovoltaics · Under Construction | 20 | 10.2 km |
How big is Low Spinney Wind Farm?
Low Spinney Wind Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Low Spinney Wind Farm?
REPD records the operator as Infinis, previously Broadview Energy Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Low Spinney Wind Farm approved and built?
The application was submitted on 2009-02-11. Permission was granted on 2009-09-03, 7 months later. The site became operational on 2011-09-29, 25 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3682.