Planning and build timeline

Application submitted2009-02-11
Permission granted2009-09-03
7 months after submission
Operational2011-09-29
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Harborough’s record on onshore wind

Harborough has decided 5 onshore wind schemes and approved 40%, taking a median of 3.9 months. See every onshore wind scheme decision in Harborough

Other built sites within 15 km

SiteMWDistance
Blaby Solar Farm
Solar Photovoltaics · Operational
3.57.8 km
Northfield House Solar Farm
Solar Photovoltaics · Operational
268 km
Narborough Landfill
Landfill Gas · Operational
2.78.5 km
Streetfield Farm
Solar Photovoltaics · Operational
18.38.6 km
Cotesbach Landfill Gas Project
Landfill Gas · Operational
2.39.1 km
Swinford Wind Farm
Wind Onshore · Operational
2210.1 km
A C Shropshire (Farm AD)
Anaerobic Digestion · Operational
2.510.1 km
Swinford Wind Farm
Solar Photovoltaics · Under Construction
2010.2 km

How big is Low Spinney Wind Farm?

Low Spinney Wind Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Low Spinney Wind Farm?

REPD records the operator as Infinis, previously Broadview Energy Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Low Spinney Wind Farm approved and built?

The application was submitted on 2009-02-11. Permission was granted on 2009-09-03, 7 months later. The site became operational on 2011-09-29, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3682.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council