Novarly ParcelRenewable sites

Renewable sitesTudworth Field Road, Hatfield - Solar Panels

Tudworth Field Road, Hatfield - Solar Panels

Tudworth Field Road, Hatfield - Solar Panels is under construction in Doncaster with a recorded capacity of 0.18 MW.

0.18 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
SJS Agriplant Limited
Doncaster
Authority
England

Planning and build timeline

Application submitted2022-03-30
Permission granted2022-07-06
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Doncaster’s record on solar

Doncaster has decided 27 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Doncaster

Other built sites within 15 km

SiteMWDistance
Tudworth Field Road, Hatfield - Solar PV Panels
Solar Photovoltaics · Operational
0.270 km
Bootham Lane Landfill
Landfill Gas · Operational
2.73 km
Bootham Lane
Landfill Gas · Operational
1.23.1 km
Bootham Lane Phase 2
Landfill Gas · Operational
1.43.1 km
Tween Bridge Windfarm
Wind Onshore · Operational
444.4 km
Twin Rivers
Wind Onshore · Operational
28.74.6 km
Thorne Farm
Solar Photovoltaics · Operational
55.8 km
Ikea Distribution Centre
Solar Photovoltaics · Operational
1.76.8 km

How big is Tudworth Field Road, Hatfield - Solar Panels?

Tudworth Field Road, Hatfield - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tudworth Field Road, Hatfield - Solar Panels?

REPD records the operator as SJS Agriplant Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tudworth Field Road, Hatfield - Solar Panels approved and built?

The application was submitted on 2022-03-30. Permission was granted on 2022-07-06, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11086.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council