Novarly ParcelRenewable sites

Renewable sitesNewton Marsh Wind Project

Newton Marsh Wind Project

Newton Marsh Wind Project is operational in East Lindsey with a recorded capacity of 4.6 MW, and has been generating since 2014-04-30.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-04-30
Wind Onshore
Technology
TCI Renewables
East Lindsey
Authority
England

Planning and build timeline

Application submitted2008-01-29
Permission granted2009-05-28
16 months after submission
Operational2014-04-30
59 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Lindsey’s record on onshore wind

East Lindsey has decided 14 onshore wind schemes and approved 50%, taking a median of 15.9 months. See every onshore wind scheme decision in East Lindsey

Other built sites within 15 km

SiteMWDistance
Bishopthorpe
Wind Onshore · Operational
16.40.7 km
Hewitts Avenue Tesco
Solar Photovoltaics · Operational
0.54.9 km
N H Case Limited - Solar Panels
Solar Photovoltaics · Under Construction
0.369 km
Low Farm Solar Array
Solar Photovoltaics · Operational
209.8 km
Grimsby West, Birchin Way - Solar Array
Solar Photovoltaics · Operational
1.1210.3 km
Fen Farm Solar Park
Solar Photovoltaics · Operational
110.4 km
Fen Farm
Wind Onshore · Operational
1610.4 km
Laceby Solar Farm
Solar Photovoltaics · Operational
27.110.4 km

How big is Newton Marsh Wind Project?

Newton Marsh Wind Project has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newton Marsh Wind Project?

REPD records the operator as TCI Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newton Marsh Wind Project approved and built?

The application was submitted on 2008-01-29. Permission was granted on 2009-05-28, 16 months later. The site became operational on 2014-04-30, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3827.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council