Bishopthorpe

Bishopthorpe is an operational 16.4 MW onshore wind farm in East Lindsey, generating since 30 January 2017. Planning permission was granted on 20 March 2015, 30 months after submission. Operator of record: Greencoat UK (formerly BayWa r.e.).

16.4 MW
Capacity
as recorded in REPD
Operational
Status
since 30 January 2017
Wind Onshore
Technology
Greencoat UK (formerly BayWa r.e.)
East Lindsey
Authority
England

Planning and build timeline

Application submitted2 October 2012
Permission granted20 March 2015
30 months after submission
Operational30 January 2017
22 months after consent

Screening a site of your own?

RedlineUK · £39

East Lindsey approves 50% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bishopthorpe’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Lindsey’s record on onshore wind

East Lindsey has decided 14 onshore wind schemes and approved 50%, taking a median of 15.9 months. See every onshore wind scheme decision in East Lindsey

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
4.60.7 km
Solar Photovoltaics · Operational
0.54.4 km
Solar Photovoltaics · Under Construction
0.368.6 km
Solar Photovoltaics · Operational
209.2 km
Solar Photovoltaics · Operational
27.19.8 km
Solar Photovoltaics · Operational
1.129.8 km
Solar Photovoltaics · Operational
110.7 km
Wind Onshore · Operational
1610.7 km

How big is Bishopthorpe?

Bishopthorpe has a recorded installed capacity of 16.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bishopthorpe?

REPD records the operator as Greencoat UK (formerly BayWa r.e.). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bishopthorpe approved and built?

The application was submitted on 2 October 2012. Permission was granted on 20 March 2015, 30 months later. The site became operational on 30 January 2017, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4256.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode