Novarly ParcelRenewable sites

Renewable sitesColton - Solar photovoltaic farm, Battery storage

Colton - Solar photovoltaic farm, Battery storage

Colton - Solar photovoltaic farm, Battery storage is under construction in South Norfolk with a recorded capacity of 30 MW.

30 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Pathfinder Clean Energy UK Dev Limited
South Norfolk
Authority
England

Planning and build timeline

Application submitted2022-03-07
Permission granted2022-06-30
4 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Norfolk’s record on battery storage

South Norfolk has decided 12 battery storage schemes and approved 100%, taking a median of 4.6 months. See every battery storage scheme decision in South Norfolk

Other built sites within 15 km

SiteMWDistance
Colton - Solar photovoltaic farm, Battery storage
Solar Photovoltaics · Under Construction
300 km
The Old Airfield
Solar Photovoltaics · Operational
55.1 km
Weston Airfield Wind Turbines
Wind Onshore · Operational
3.65.3 km
Woodforde Farm
Solar Photovoltaics · Operational
95.6 km
Hardingham Solar Farm
Solar Photovoltaics · Operational
14.86.1 km
Hardingham Solar Farm - extension
Solar Photovoltaics · Operational
5.26.3 km
Costessey Landfill Gas Project 2
Landfill Gas · Operational
27.1 km
New Road Solar Farm
Solar Photovoltaics · Under Construction
57.4 km

How big is Colton - Solar photovoltaic farm, Battery storage?

Colton - Solar photovoltaic farm, Battery storage has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Colton - Solar photovoltaic farm, Battery storage?

REPD records the operator as Pathfinder Clean Energy UK Dev Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Colton - Solar photovoltaic farm, Battery storage approved and built?

The application was submitted on 2022-03-07. Permission was granted on 2022-06-30, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10945.