New Rides Wind Farm is an operational 8.8 MW onshore wind farm in Swale, generating since 1 December 2018. Planning permission was granted on 9 August 2017, 42 months after submission. Operator of record: Airvolution Energy.

8.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2018
Wind Onshore
Technology
Airvolution Energy
Swale
Authority
England

Planning and build timeline

Application submitted27 January 2014
Permission granted9 August 2017
42 months after submission
Operational1 December 2018
16 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Swale: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with New Rides Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
80.6 km
Wind Onshore · Operational
4.60.9 km
Solar Photovoltaics · Operational
114 km
Battery · Under Construction
406.8 km
Battery · Operational
1507.3 km
Solar Photovoltaics · Operational
3737.3 km
Solar Photovoltaics · Operational
227.3 km
Biomass (dedicated) · Operational
257.4 km

How big is New Rides Wind Farm?

New Rides Wind Farm has a recorded installed capacity of 8.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates New Rides Wind Farm?

REPD records the operator as Airvolution Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was New Rides Wind Farm approved and built?

The application was submitted on 27 January 2014. Permission was granted on 9 August 2017, 42 months later. The site became operational on 1 December 2018, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4403.