Renewable sitesHMP Standford Hill

HMP Standford Hill

HMP Standford Hill is operational in Swale with a recorded capacity of 4.6 MW, and has been generating since 2013-02-08.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-02-08
Wind Onshore
Technology
Resonance
Swale
Authority
England

Planning and build timeline

Application submitted2010-12-21
Permission granted2011-11-11
11 months after submission
Operational2013-02-08
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
New Rides Wind Farm
Wind Onshore · Operational
8.80.9 km
Old Rides solar Farm
Solar Photovoltaics · Operational
81.3 km
South Lees Farm
Solar Photovoltaics · Operational
113.2 km
Land off Queenborough Road
Battery · Under Construction
406 km
Ridham CHP Plant
Biomass (dedicated) · Operational
256.6 km
Tonge Corner Farm
Solar Photovoltaics · Operational
226.6 km
K3 CHP Facility (Kemsley EfW)
EfW Incineration · Operational
49.97.1 km
Cleve Hill Solar Project
Solar Photovoltaics · Operational
3737.6 km

How big is HMP Standford Hill?

HMP Standford Hill has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates HMP Standford Hill?

REPD records the operator as Resonance. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was HMP Standford Hill approved and built?

The application was submitted on 2010-12-21. Permission was granted on 2011-11-11, 11 months later. The site became operational on 2013-02-08, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3733.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council