Renewable sites › Nectar Way Regional Distribution Centre
Nectar Way Regional Distribution Centre
Nectar Way Regional Distribution Centre is an operational 1 MW solar farm in West Northamptonshire, generating since 12 June 2015. REPD does not record the planning grant date. Operator of record: Sainsburys Supermarkets Limited.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 12 June 2015 |
Screening a site of your own?
West Northamptonshire approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Nectar Way Regional Distribution Centre’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Northamptonshire’s record on solar
West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.8 | 1.9 km |
Solar Photovoltaics · Operational | 8.8 | 3.7 km |
Landfill Gas · Operational | 2 | 4 km |
Biomass (dedicated) · Operational | 1.9 | 5.8 km |
Landfill Gas · Operational | 2 | 5.9 km |
Solar Photovoltaics · Operational | 0.15 | 6.6 km |
Solar Photovoltaics · Operational | 4 | 6.8 km |
Anaerobic Digestion · Under Construction | — | 8.3 km |
How big is Nectar Way Regional Distribution Centre?
Nectar Way Regional Distribution Centre has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Nectar Way Regional Distribution Centre?
REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Nectar Way Regional Distribution Centre approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 12 June 2015.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5596.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode