Novarly ParcelRenewable sites

Renewable sitesNectar Way Regional Distribution Centre

Nectar Way Regional Distribution Centre

Nectar Way Regional Distribution Centre is operational in West Northamptonshire with a recorded capacity of 1 MW, and has been generating since 2015-06-12.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-06-12
Solar Photovoltaics
Technology
Sainsburys Supermarkets Limited
West Northamptonshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2015-06-12

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on solar

West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Land to the south of Hill Farm
Solar Photovoltaics · Operational
6.81.9 km
Cinch Stadium, Franklin�s Gardens - Solar
Solar Photovoltaics · Operational
8.83.7 km
Weston Landfill Site
Landfill Gas · Operational
24 km
Northampton General Hospital
Biomass (dedicated) · Operational
1.95.8 km
Wooton
Landfill Gas · Operational
25.9 km
Wieland Nemco, Pennard Close - Solar panels
Solar Photovoltaics · Operational
0.156.6 km
Land South of Knock Lane
Solar Photovoltaics · Operational
46.8 km
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility
Anaerobic Digestion · Under Construction
8.3 km

How big is Nectar Way Regional Distribution Centre?

Nectar Way Regional Distribution Centre has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nectar Way Regional Distribution Centre?

REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nectar Way Regional Distribution Centre approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2015-06-12.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5596.