Weston Landfill Site is operational in West Northamptonshire with a recorded capacity of 2 MW, and has been generating since 2003-12-31.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-12-31
Landfill Gas
Technology
Vivid Waste Management
West Northamptonshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2003-12-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Land to the south of Hill Farm
Solar Photovoltaics · Operational
6.83.5 km
Nectar Way Regional Distribution Centre
Solar Photovoltaics · Operational
14 km
Cinch Stadium, Franklin�s Gardens - Solar
Solar Photovoltaics · Operational
8.87.1 km
East Haddon - Solar Photovoltaic System
Solar Photovoltaics · Under Construction
28.9 km
Land South of Knock Lane
Solar Photovoltaics · Operational
49.5 km
Northampton General Hospital
Biomass (dedicated) · Operational
1.99.5 km
Wooton
Landfill Gas · Operational
29.6 km
Wieland Nemco, Pennard Close - Solar panels
Solar Photovoltaics · Operational
0.1510.5 km

How big is Weston Landfill Site?

Weston Landfill Site has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Weston Landfill Site?

REPD records the operator as Vivid Waste Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Weston Landfill Site approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2003-12-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 678.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council