Weston Landfill Site
Weston Landfill Site is an operational 2 MW landfill gas site in West Northamptonshire, generating since 31 December 2003. REPD does not record the planning grant date. Operator of record: Vivid Waste Management.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 31 December 2003 |
Screening a site of your own?
Redline runs the record on your own boundary in West Northamptonshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Weston Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.8 | 3.5 km |
Solar Photovoltaics · Operational | 1 | 4 km |
Solar Photovoltaics · Operational | 8.8 | 7.1 km |
Solar Photovoltaics · Under Construction | 2 | 8.9 km |
Solar Photovoltaics · Operational | 4 | 9.5 km |
Biomass (dedicated) · Operational | 1.9 | 9.5 km |
Landfill Gas · Operational | 2 | 9.6 km |
Solar Photovoltaics · Operational | 0.15 | 10.5 km |
How big is Weston Landfill Site?
Weston Landfill Site has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Weston Landfill Site?
REPD records the operator as Vivid Waste Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Weston Landfill Site approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 31 December 2003.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 678.