Renewable sites › Weston Landfill Site
Weston Landfill Site
Weston Landfill Site is operational in West Northamptonshire with a recorded capacity of 2 MW, and has been generating since 2003-12-31.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2003-12-31 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land to the south of Hill Farm Solar Photovoltaics · Operational | 6.8 | 3.5 km |
Nectar Way Regional Distribution Centre Solar Photovoltaics · Operational | 1 | 4 km |
Cinch Stadium, Franklin�s Gardens - Solar Solar Photovoltaics · Operational | 8.8 | 7.1 km |
East Haddon - Solar Photovoltaic System Solar Photovoltaics · Under Construction | 2 | 8.9 km |
Land South of Knock Lane Solar Photovoltaics · Operational | 4 | 9.5 km |
Northampton General Hospital Biomass (dedicated) · Operational | 1.9 | 9.5 km |
Wooton Landfill Gas · Operational | 2 | 9.6 km |
Wieland Nemco, Pennard Close - Solar panels Solar Photovoltaics · Operational | 0.15 | 10.5 km |
How big is Weston Landfill Site?
Weston Landfill Site has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Weston Landfill Site?
REPD records the operator as Vivid Waste Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Weston Landfill Site approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2003-12-31.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 678.
Novarly Parcel · official public data, read properly · parcel.novarly.com