Renewable sites › Northampton General Hospital
Northampton General Hospital
Northampton General Hospital is operational in West Northamptonshire with a recorded capacity of 1.9 MW, and has been generating since 2016-03-01.
Planning and build timeline
| Application submitted | 2014-05-12 |
| Permission granted | 2014-06-30 2 months after submission |
| Operational | 2016-03-01 20 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wieland Nemco, Pennard Close - Solar panels Solar Photovoltaics · Operational | 0.15 | 2.1 km |
Cinch Stadium, Franklin�s Gardens - Solar Solar Photovoltaics · Operational | 8.8 | 2.6 km |
Wooton Landfill Gas · Operational | 2 | 4.9 km |
Nectar Way Regional Distribution Centre Solar Photovoltaics · Operational | 1 | 5.8 km |
Land East of Horton Road Solar Photovoltaics · Operational | 4.9 | 6.9 km |
Land to the south of Hill Farm Solar Photovoltaics · Operational | 6.8 | 7.3 km |
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility Anaerobic Digestion · Under Construction | — | 7.5 km |
M1 Wind Farm Wind Onshore · Operational | 7.2 | 8.4 km |
How big is Northampton General Hospital?
Northampton General Hospital has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Northampton General Hospital?
REPD records the operator as Northampton General Hospital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Northampton General Hospital approved and built?
The application was submitted on 2014-05-12. Permission was granted on 2014-06-30, 2 months later. The site became operational on 2016-03-01, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 182.