Novarly ParcelRenewable sites

Renewable sitesWieland Nemco, Pennard Close - Solar panels

Wieland Nemco, Pennard Close - Solar panels

Wieland Nemco, Pennard Close - Solar panels is operational in West Northamptonshire with a recorded capacity of 0.15 MW, and has been generating since 2023-06-01.

0.15 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-06-01
Solar Photovoltaics
Technology
Wieland Werke (UK) Limited
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted2023-01-24
Permission granted2023-02-23
1 months after submission
Operational2023-06-01
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on solar

West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Northampton General Hospital
Biomass (dedicated) · Operational
1.92.1 km
Wooton
Landfill Gas · Operational
23.5 km
Cinch Stadium, Franklin�s Gardens - Solar
Solar Photovoltaics · Operational
8.84.3 km
Land East of Horton Road
Solar Photovoltaics · Operational
4.95.1 km
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility
Anaerobic Digestion · Under Construction
5.8 km
Nectar Way Regional Distribution Centre
Solar Photovoltaics · Operational
16.6 km
M1 Wind Farm
Wind Onshore · Operational
7.26.6 km
Land South of Knock Lane
Solar Photovoltaics · Operational
47.5 km

How big is Wieland Nemco, Pennard Close - Solar panels?

Wieland Nemco, Pennard Close - Solar panels has a recorded installed capacity of 0.15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wieland Nemco, Pennard Close - Solar panels?

REPD records the operator as Wieland Werke (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wieland Nemco, Pennard Close - Solar panels approved and built?

The application was submitted on 2023-01-24. Permission was granted on 2023-02-23, 1 months later. The site became operational on 2023-06-01, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13162.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council