Wieland Nemco, Pennard Close - Solar panels is an operational 0.15 MW solar farm in West Northamptonshire, generating since 1 June 2023. Planning permission was granted on 23 February 2023, 1 months after submission. Operator of record: Wieland Werke (UK) Limited.

0.15 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2023
Solar Photovoltaics
Technology
Wieland Werke (UK) Limited
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted24 January 2023
Permission granted23 February 2023
1 months after submission
Operational1 June 2023
3 months after consent

Screening a site of your own?

RedlineUK · £39

West Northamptonshire approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wieland Nemco, Pennard Close - Solar panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on solar

West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
1.92.1 km
Landfill Gas · Operational
23.5 km
Solar Photovoltaics · Operational
8.84.3 km
Solar Photovoltaics · Operational
4.95.1 km
Anaerobic Digestion · Under Construction
5.8 km
Solar Photovoltaics · Operational
16.6 km
Wind Onshore · Operational
7.26.6 km
Solar Photovoltaics · Operational
47.5 km

How big is Wieland Nemco, Pennard Close - Solar panels?

Wieland Nemco, Pennard Close - Solar panels has a recorded installed capacity of 0.15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wieland Nemco, Pennard Close - Solar panels?

REPD records the operator as Wieland Werke (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wieland Nemco, Pennard Close - Solar panels approved and built?

The application was submitted on 24 January 2023. Permission was granted on 23 February 2023, 1 months later. The site became operational on 1 June 2023, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13162.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode