Renewable sites › East Lodge Farm, Quinton Road - Anaerobic Digestion Facility
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility is under construction in West Northamptonshire.
Planning and build timeline
| Application submitted | 2023-02-13 |
| Permission granted | 2024-01-18 11 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
M1 Wind Farm Wind Onshore · Operational | 7.2 | 1.2 km |
Wooton Landfill Gas · Operational | 2 | 2.8 km |
Land South of Knock Lane Solar Photovoltaics · Operational | 4 | 3.4 km |
Stonepit Farm Solar Photovoltaics · Operational | 5 | 4.3 km |
Bulls Head Farm North Solar Photovoltaics · Operational | 4.7 | 4.6 km |
Salcey Solar Farm Battery · Operational | 1 | 5 km |
Wieland Nemco, Pennard Close - Solar panels Solar Photovoltaics · Operational | 0.15 | 5.8 km |
Manor Farm (Horton) Solar Photovoltaics · Operational | 5 | 6.4 km |
How big is East Lodge Farm, Quinton Road - Anaerobic Digestion Facility?
REPD does not record an installed capacity for East Lodge Farm, Quinton Road - Anaerobic Digestion Facility.
Who operates East Lodge Farm, Quinton Road - Anaerobic Digestion Facility?
REPD records the operator as Acorn Bioenergy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was East Lodge Farm, Quinton Road - Anaerobic Digestion Facility approved and built?
The application was submitted on 2023-02-13. Permission was granted on 2024-01-18, 11 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12268.