Novarly ParcelRenewable sites

Renewable sitesMuirake

Muirake

Muirake is an operational 4.6 MW onshore wind farm in Aberdeenshire, generating since 13 December 2011. Planning permission was granted on 8 September 2010, 10 months after submission. Operator of record: Vento Ludens.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 13 December 2011
Wind Onshore
Technology
Vento Ludens
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2 November 2009
Permission granted8 September 2010
10 months after submission
Operational13 December 2011
15 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Muirake’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.45.7 km
Wind Onshore · Operational
2.46.8 km
Wind Onshore · Operational
6.96.9 km
Wind Onshore · Operational
2.37 km
Wind Onshore · Operational
2.37.1 km
Wind Onshore · Operational
1.67.2 km
Wind Onshore · Operational
16.77.9 km
Wind Onshore · Operational
4.67.9 km

How big is Muirake?

Muirake has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Muirake?

REPD records the operator as Vento Ludens. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Muirake approved and built?

The application was submitted on 2 November 2009. Permission was granted on 8 September 2010, 10 months later. The site became operational on 13 December 2011, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3594.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode