Novarly ParcelRenewable sites

Renewable sitesMornflake Oats Wind Turbine

Mornflake Oats Wind Turbine

Mornflake Oats Wind Turbine is operational in Aberdeenshire with a recorded capacity of 2.3 MW, and has been generating since 2012-01-18.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-01-18
Wind Onshore
Technology
Mornflake Oats/ Hamlyns Oats
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2008-08-05
Permission granted2011-04-06
32 months after submission
Operational2012-01-18
9 months after consent

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Boyndie Airfield Extension
Wind Onshore · Operational
2.30.3 km
Boyndie Airfield
Wind Onshore · Operational
16.70.7 km
Gawnsmoss Cluster
Wind Onshore · Operational
2.44.6 km
Strath of Brydock - Extension
Wind Onshore · Operational
2.35.4 km
Strath of Brydock
Wind Onshore · Operational
4.65.4 km
Muirake
Wind Onshore · Operational
4.67.1 km
Deuchries
Wind Onshore · Operational
6.97.9 km
Auchinderran Wind Farm
Wind Onshore · Operational
2.48.7 km

How big is Mornflake Oats Wind Turbine?

Mornflake Oats Wind Turbine has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mornflake Oats Wind Turbine?

REPD records the operator as Mornflake Oats/ Hamlyns Oats. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mornflake Oats Wind Turbine approved and built?

The application was submitted on 2008-08-05. Permission was granted on 2011-04-06, 32 months later. The site became operational on 2012-01-18, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2822.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council