Renewable sites › Myreton Crossroads
Myreton Crossroads
Myreton Crossroads is an operational 1.6 MW onshore wind farm in Moray, generating since 5 July 2013. Planning permission was granted on 19 July 2010, 17 months after submission. Operator of record: Seren Energy.
Planning and build timeline
| Application submitted | 9 February 2009 |
| Permission granted | 19 July 2010 17 months after submission |
| Operational | 5 July 2013 36 months after consent |
Screening a site of your own?
Moray approves 77% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Myreton Crossroads’s recorded coordinate — swap in your own postcode or coordinates.
Moray’s record on onshore wind
Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 4.6 | 0.9 km |
Wind Onshore · Operational | 4.6 | 7.2 km |
Battery · Under Construction | 300 | 11 km |
Wind Onshore · Operational | 2.4 | 11.9 km |
Anaerobic Digestion · Under Construction | — | 12.6 km |
Wind Onshore · Operational | 18 | 12.6 km |
Wind Onshore · Operational | 2.3 | 13.3 km |
Wind Onshore · Operational | 2.3 | 13.6 km |
How big is Myreton Crossroads?
Myreton Crossroads has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Myreton Crossroads?
REPD records the operator as Seren Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Myreton Crossroads approved and built?
The application was submitted on 9 February 2009. Permission was granted on 19 July 2010, 17 months later. The site became operational on 5 July 2013, 36 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3804.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode