Renewable sitesNetherton of Windyhills

Netherton of Windyhills

Netherton of Windyhills is operational in Moray with a recorded capacity of 4.6 MW, and has been generating since 2014-11-01.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-11-01
Wind Onshore
Technology
Strathdee Energy
Moray
Authority
Scotland

Planning and build timeline

Application submitted2009-06-15
Permission granted2010-10-15
16 months after submission
Operational2014-11-01
49 months after consent

Moray’s record on onshore wind

Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray

Other built sites within 15 km

SiteMWDistance
Myreton Crossroads
Wind Onshore · Operational
1.60.9 km
Muirake
Wind Onshore · Operational
4.67.9 km
Blackhillock Electricity Substation - Battery Energy Storage System
Battery · Under Construction
30010.9 km
Portgordon - Anaerobic Digestion Tanks
Anaerobic Digestion · Under Construction
11.7 km
Edintore Wind Farm
Wind Onshore · Operational
1812.6 km
Auchinderran Wind Farm
Wind Onshore · Operational
2.412.7 km
Boyndie Airfield Extension
Wind Onshore · Operational
2.313.8 km
Mornflake Oats Wind Turbine
Wind Onshore · Operational
2.314.1 km

How big is Netherton of Windyhills?

Netherton of Windyhills has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Netherton of Windyhills?

REPD records the operator as Strathdee Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Netherton of Windyhills approved and built?

The application was submitted on 2009-06-15. Permission was granted on 2010-10-15, 16 months later. The site became operational on 2014-11-01, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3691.