Noble Foods is operational in Fife with a recorded capacity of 1.5 MW, and has been generating since 2014-12-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-01
Wind Onshore
Technology
Wind Direct
Fife
Authority
Scotland

Planning and build timeline

Application submitted2011-05-10
Permission granted2011-11-15
6 months after submission
Operational2014-12-01
37 months after consent

Fife’s record on onshore wind

Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife

Other built sites within 15 km

SiteMWDistance
Skeddoway Farm Wind Turbine
Wind Onshore · Operational
1.50.3 km
West Strathore Solar Limited
Solar Photovoltaics · Operational
50.5 km
Middle Balbeggie Wind Turbines
Wind Onshore · Operational
6.41.2 km
Middle Balbeggie
Solar Photovoltaics · Operational
52 km
Inchdairnie
Anaerobic Digestion · Operational
23.6 km
Markinch Biomass CHP Plant
Biomass (dedicated) · Operational
654.1 km
Earlseat
Wind Onshore · Operational
18.45 km
Kirkcaldy W W T W, Nether Street- Solar Panels
Solar Photovoltaics · Operational
0.655 km

How big is Noble Foods?

Noble Foods has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Noble Foods?

REPD records the operator as Wind Direct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Noble Foods approved and built?

The application was submitted on 2011-05-10. Permission was granted on 2011-11-15, 6 months later. The site became operational on 2014-12-01, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4404.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council