Novarly ParcelRenewable sites

Renewable sitesNoble Foods

Noble Foods

Noble Foods is an operational 1.5 MW onshore wind farm in Fife, generating since 1 December 2014. Planning permission was granted on 15 November 2011, 6 months after submission. Operator of record: Wind Direct.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2014
Wind Onshore
Technology
Wind Direct
Fife
Authority
Scotland

Planning and build timeline

Application submitted10 May 2011
Permission granted15 November 2011
6 months after submission
Operational1 December 2014
37 months after consent

Screening a site of your own?

RedlineUK · £39

Fife approves 54% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Noble Foods’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fife’s record on onshore wind

Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1.50.3 km
Solar Photovoltaics · Operational
50.5 km
Wind Onshore · Operational
6.41.2 km
Solar Photovoltaics · Operational
52 km
Anaerobic Digestion · Operational
23.6 km
Biomass (dedicated) · Operational
654.1 km
Wind Onshore · Operational
18.45 km
Solar Photovoltaics · Operational
0.655 km

How big is Noble Foods?

Noble Foods has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Noble Foods?

REPD records the operator as Wind Direct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Noble Foods approved and built?

The application was submitted on 10 May 2011. Permission was granted on 15 November 2011, 6 months later. The site became operational on 1 December 2014, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4404.