Noble Foods is operational in Fife with a recorded capacity of 1.5 MW, and has been generating since 2014-12-01.
Planning and build timeline
| Application submitted | 2011-05-10 |
| Permission granted | 2011-11-15 6 months after submission |
| Operational | 2014-12-01 37 months after consent |
Fife’s record on onshore wind
Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Skeddoway Farm Wind Turbine Wind Onshore · Operational | 1.5 | 0.3 km |
West Strathore Solar Limited Solar Photovoltaics · Operational | 5 | 0.5 km |
Middle Balbeggie Wind Turbines Wind Onshore · Operational | 6.4 | 1.2 km |
Middle Balbeggie Solar Photovoltaics · Operational | 5 | 2 km |
Inchdairnie Anaerobic Digestion · Operational | 2 | 3.6 km |
Markinch Biomass CHP Plant Biomass (dedicated) · Operational | 65 | 4.1 km |
Earlseat Wind Onshore · Operational | 18.4 | 5 km |
Kirkcaldy W W T W, Nether Street- Solar Panels Solar Photovoltaics · Operational | 0.65 | 5 km |
How big is Noble Foods?
Noble Foods has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Noble Foods?
REPD records the operator as Wind Direct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Noble Foods approved and built?
The application was submitted on 2011-05-10. Permission was granted on 2011-11-15, 6 months later. The site became operational on 2014-12-01, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4404.
Novarly Parcel · official public data, read properly · parcel.novarly.com