Renewable sites › Dunsinane Industrial Estate
Dunsinane Industrial Estate
Dunsinane Industrial Estate is an operational 49.9 MW battery storage site in Dundee City, generating since 3 May 2023. Planning permission was granted on 18 February 2022, 27 months after submission. Operator of record: JLEN Environmental Assets Group.
Planning and build timeline
| Application submitted | 2 December 2019 |
| Permission granted | 18 February 2022 27 months after submission |
| Operational | 3 May 2023 14 months after consent |
Screening a site of your own?
Dundee City approves 80% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Dunsinane Industrial Estate’s recorded coordinate — swap in your own postcode or coordinates.
Dundee City’s record on battery storage
Dundee City has decided 5 battery storage schemes and approved 80%, taking a median of 6 months. See every battery storage scheme decision in Dundee City →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | 49.9 | 2.7 km |
Solar Photovoltaics · Under Construction | — | 2.7 km |
EfW Incineration · Operational | 8.3 | 6.8 km |
EfW Incineration · Under Construction | 10 | 6.8 km |
Wind Onshore · Operational | 4 | 7.3 km |
Solar Photovoltaics · Operational | 4 | 7.8 km |
Wind Onshore · Operational | 6.4 | 10.3 km |
Solar Photovoltaics · Operational | 1 | 14.8 km |
How big is Dunsinane Industrial Estate?
Dunsinane Industrial Estate has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dunsinane Industrial Estate?
REPD records the operator as JLEN Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dunsinane Industrial Estate approved and built?
The application was submitted on 2 December 2019. Permission was granted on 18 February 2022, 27 months later. The site became operational on 3 May 2023, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7591.