Maerdy is an operational 24 MW onshore wind farm in Rhondda Cynon Taf, generating since 31 August 2013. Planning permission was granted on 10 February 2008, 17 months after submission. Operator of record: Greencoat UK Wind.
Planning and build timeline
| Application submitted | 1 September 2006 |
| Permission granted | 10 February 2008 17 months after submission |
| Operational | 31 August 2013 67 months after consent |
Screening a site of your own?
Rhondda Cynon Taf approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Maerdy’s recorded coordinate — swap in your own postcode or coordinates.
Rhondda Cynon Taf’s record on onshore wind
Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 22.5 | 2 km |
Landfill Gas · Operational | 2.7 | 5 km |
Solar Photovoltaics · Under Construction | 9.88 | 5.1 km |
Battery · Operational | 21.76 | 5.3 km |
Solar Photovoltaics · Operational | 8.94 | 5.7 km |
Advanced Conversion Technologies · Operational | 20 | 6 km |
Wind Onshore · Operational | 6.4 | 6.9 km |
Solar Photovoltaics · Operational | 11.6 | 7 km |
How big is Maerdy?
Maerdy has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Maerdy?
REPD records the operator as Greencoat UK Wind. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Maerdy approved and built?
The application was submitted on 1 September 2006. Permission was granted on 10 February 2008, 17 months later. The site became operational on 31 August 2013, 67 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4138.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode