Maerdy

Maerdy is an operational 24 MW onshore wind farm in Rhondda Cynon Taf, generating since 31 August 2013. Planning permission was granted on 10 February 2008, 17 months after submission. Operator of record: Greencoat UK Wind.

24 MW
Capacity
as recorded in REPD
Operational
Status
since 31 August 2013
Wind Onshore
Technology
Greencoat UK Wind
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted1 September 2006
Permission granted10 February 2008
17 months after submission
Operational31 August 2013
67 months after consent

Screening a site of your own?

RedlineUK · £39

Rhondda Cynon Taf approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Maerdy’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Rhondda Cynon Taf’s record on onshore wind

Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
22.52 km
Landfill Gas · Operational
2.75 km
Solar Photovoltaics · Under Construction
9.885.1 km
Battery · Operational
21.765.3 km
Solar Photovoltaics · Operational
8.945.7 km
Advanced Conversion Technologies · Operational
206 km
Wind Onshore · Operational
6.46.9 km
Solar Photovoltaics · Operational
11.67 km

How big is Maerdy?

Maerdy has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Maerdy?

REPD records the operator as Greencoat UK Wind. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Maerdy approved and built?

The application was submitted on 1 September 2006. Permission was granted on 10 February 2008, 17 months later. The site became operational on 31 August 2013, 67 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4138.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode