Enviroparks Hirwaun Generation Site
Enviroparks Hirwaun Generation Site is an operational 20 MW advanced conversion plant in Rhondda Cynon Taf, generating since 1 September 2019. Planning permission was granted on 21 December 2010, 24 months after submission. Operator of record: Enviroparks Operations.
Planning and build timeline
| Application submitted | 19 December 2008 |
| Permission granted | 21 December 2010 24 months after submission |
| Operational | 1 September 2019 104 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Rhondda Cynon Taf: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Enviroparks Hirwaun Generation Site’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | 21.76 | 0.8 km |
Solar Photovoltaics · Under Construction | 9.88 | 1.2 km |
Solar Photovoltaics · Operational | 8.94 | 1.2 km |
Solar Photovoltaics · Operational | 11.6 | 3.8 km |
Wind Onshore · Operational | 22.5 | 4.4 km |
Solar Photovoltaics · Operational | 7.5 | 5.9 km |
Wind Onshore · Operational | 24 | 6 km |
Anaerobic Digestion · Operational | 1 | 7.2 km |
How big is Enviroparks Hirwaun Generation Site?
Enviroparks Hirwaun Generation Site has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Enviroparks Hirwaun Generation Site?
REPD records the operator as Enviroparks Operations. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Enviroparks Hirwaun Generation Site approved and built?
The application was submitted on 19 December 2008. Permission was granted on 21 December 2010, 24 months later. The site became operational on 1 September 2019, 104 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 120.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode