Penrhys Wind Farm/Ferndale Power Factory is an operational 6.4 MW onshore wind farm in Rhondda Cynon Taf, generating since 8 June 2011. Planning permission was granted on 1 March 2005, 25 months after submission. Operator of record: John Laing Environmental Assets Group.

6.4 MW
Capacity
as recorded in REPD
Operational
Status
since 8 June 2011
Wind Onshore
Technology
John Laing Environmental Assets Group
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted11 February 2003
Permission granted1 March 2005
25 months after submission
Operational8 June 2011
75 months after consent

Screening a site of your own?

RedlineUK · £39

Rhondda Cynon Taf approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Penrhys Wind Farm/Ferndale Power Factory’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Rhondda Cynon Taf’s record on onshore wind

Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.72.3 km
Wind Onshore · Under Construction
1.52.7 km
Wind Onshore · Operational
105.4 km
Solar Photovoltaics · Operational
4.75.4 km
Wind Onshore · Operational
255.7 km
Wind Onshore · Operational
17.55.9 km
Wind Onshore · Operational
246.9 km
Wind Onshore · Operational
22.58.2 km

How big is Penrhys Wind Farm/Ferndale Power Factory?

Penrhys Wind Farm/Ferndale Power Factory has a recorded installed capacity of 6.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Penrhys Wind Farm/Ferndale Power Factory?

REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Penrhys Wind Farm/Ferndale Power Factory approved and built?

The application was submitted on 11 February 2003. Permission was granted on 1 March 2005, 25 months later. The site became operational on 8 June 2011, 75 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3660.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode