Hendre Fawr Farm

Hendre Fawr Farm is operational in Neath Port Talbot with a recorded capacity of 11.6 MW, and has been generating since 2015-03-06.

11.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-06
Solar Photovoltaics
Technology
INRG Solar
Neath Port Talbot
Authority
Wales

Planning and build timeline

Application submitted2013-09-18
Permission granted2014-07-06
10 months after submission
Operational2015-03-06
8 months after consent

Neath Port Talbot’s record on solar

Neath Port Talbot has decided 12 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Neath Port Talbot

Other built sites within 15 km

SiteMWDistance
Bryngolwg Farm, Hirwaun - Solar farm
Solar Photovoltaics · Operational
8.942.6 km
Rhigos Road - Solar Farm
Solar Photovoltaics · Under Construction
9.883.2 km
Maesgwyn solar farm
Solar Photovoltaics · Operational
7.53.5 km
Hirwaun Stor Generation - Battery Storage
Battery · Operational
21.763.5 km
Maesgwyn Wind Farm - extension
Wind Onshore · Operational
2.53.7 km
Enviroparks Hirwaun Generation Site
Advanced Conversion Technologies · Operational
203.8 km
Maesgwyn
Wind Onshore · Operational
264.7 km
Mynydd Bwllfa Wind Farm - Resubmission
Wind Onshore · Operational
22.56.3 km

How big is Hendre Fawr Farm?

Hendre Fawr Farm has a recorded installed capacity of 11.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hendre Fawr Farm?

REPD records the operator as INRG Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hendre Fawr Farm approved and built?

The application was submitted on 2013-09-18. Permission was granted on 2014-07-06, 10 months later. The site became operational on 2015-03-06, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2286.