Novarly ParcelRenewable sites

Renewable sitesHendre Fawr Farm

Hendre Fawr Farm

Hendre Fawr Farm is an operational 11.6 MW solar farm in Neath Port Talbot, generating since 6 March 2015. Planning permission was granted on 6 July 2014, 10 months after submission. Operator of record: INRG Solar.

11.6 MW
Capacity
as recorded in REPD
Operational
Status
since 6 March 2015
Solar Photovoltaics
Technology
INRG Solar
Neath Port Talbot
Authority
Wales

Planning and build timeline

Application submitted18 September 2013
Permission granted6 July 2014
10 months after submission
Operational6 March 2015
8 months after consent

Screening a site of your own?

RedlineUK · £39

Neath Port Talbot approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hendre Fawr Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Neath Port Talbot’s record on solar

Neath Port Talbot has decided 12 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Neath Port Talbot

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
8.942.6 km
Solar Photovoltaics · Under Construction
9.883.2 km
Solar Photovoltaics · Operational
7.53.5 km
Battery · Operational
21.763.5 km
Wind Onshore · Operational
2.53.7 km
Advanced Conversion Technologies · Operational
203.8 km
Wind Onshore · Operational
264.7 km
Wind Onshore · Operational
22.56.3 km

How big is Hendre Fawr Farm?

Hendre Fawr Farm has a recorded installed capacity of 11.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hendre Fawr Farm?

REPD records the operator as INRG Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hendre Fawr Farm approved and built?

The application was submitted on 18 September 2013. Permission was granted on 6 July 2014, 10 months later. The site became operational on 6 March 2015, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2286.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode