Bryngolwg Farm, Hirwaun - Solar farm
Bryngolwg Farm, Hirwaun - Solar farm is an operational 8.94 MW solar farm in Rhondda Cynon Taf. Planning permission was granted on 27 June 2022, 0 months after submission. Operator of record: Enviromena Asset Management UK Limited.
Planning and build timeline
| Application submitted | 15 June 2022 |
| Permission granted | 27 June 2022 0 months after submission |
| Operational | not recorded |
Screening a site of your own?
Rhondda Cynon Taf approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bryngolwg Farm, Hirwaun - Solar farm’s recorded coordinate — swap in your own postcode or coordinates.
Rhondda Cynon Taf’s record on solar
Rhondda Cynon Taf has decided 13 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Rhondda Cynon Taf →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 9.88 | 0.7 km |
Battery · Operational | 21.76 | 0.9 km |
Advanced Conversion Technologies · Operational | 20 | 1.2 km |
Solar Photovoltaics · Operational | 11.6 | 2.6 km |
Wind Onshore · Operational | 22.5 | 4.5 km |
Solar Photovoltaics · Operational | 7.5 | 5.2 km |
Wind Onshore · Operational | 24 | 5.7 km |
Wind Onshore · Operational | 2.5 | 6.3 km |
How big is Bryngolwg Farm, Hirwaun - Solar farm?
Bryngolwg Farm, Hirwaun - Solar farm has a recorded installed capacity of 8.94 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bryngolwg Farm, Hirwaun - Solar farm?
REPD records the operator as Enviromena Asset Management UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bryngolwg Farm, Hirwaun - Solar farm approved and built?
The application was submitted on 15 June 2022. Permission was granted on 27 June 2022, 0 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11509.