Novarly ParcelRenewable sites

Renewable sitesBryngolwg Farm, Hirwaun - Solar farm

Bryngolwg Farm, Hirwaun - Solar farm

Bryngolwg Farm, Hirwaun - Solar farm is an operational 8.94 MW solar farm in Rhondda Cynon Taf. Planning permission was granted on 27 June 2022, 0 months after submission. Operator of record: Enviromena Asset Management UK Limited.

8.94 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Solar Photovoltaics
Technology
Enviromena Asset Management UK Limited
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted15 June 2022
Permission granted27 June 2022
0 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Rhondda Cynon Taf approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bryngolwg Farm, Hirwaun - Solar farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Rhondda Cynon Taf’s record on solar

Rhondda Cynon Taf has decided 13 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
9.880.7 km
Battery · Operational
21.760.9 km
Advanced Conversion Technologies · Operational
201.2 km
Solar Photovoltaics · Operational
11.62.6 km
Wind Onshore · Operational
22.54.5 km
Solar Photovoltaics · Operational
7.55.2 km
Wind Onshore · Operational
245.7 km
Wind Onshore · Operational
2.56.3 km

How big is Bryngolwg Farm, Hirwaun - Solar farm?

Bryngolwg Farm, Hirwaun - Solar farm has a recorded installed capacity of 8.94 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bryngolwg Farm, Hirwaun - Solar farm?

REPD records the operator as Enviromena Asset Management UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bryngolwg Farm, Hirwaun - Solar farm approved and built?

The application was submitted on 15 June 2022. Permission was granted on 27 June 2022, 0 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11509.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode