Novarly ParcelRenewable sites

Renewable sitesGowy Landfill Site, Cheshire (Extension)

Gowy Landfill Site, Cheshire (Extension)

Gowy Landfill Site, Cheshire (Extension) is operational in Cheshire West and Chester with a recorded capacity of 6 MW, and has been generating since 2000-02-01.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-02-01
Landfill Gas
Technology
Waste Recycling Group
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submittednot recorded
Permission granted1999-10-13
Operational2000-02-01
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Gowy Landfill Site
Landfill Gas · Operational
1.60 km
Longlooms Road East - Solar panels
Solar Photovoltaics · Operational
0.224.4 km
Plot 8 Protos/Ince Marshes
EfW Incineration · Under Construction
355.1 km
Ince Bio Power
Advanced Conversion Technologies · Operational
21.55.1 km
S P & G Blything, Cross Lanes - Biomass Boiler
Biomass (dedicated) · Operational
0.37.4 km
Huntington Water Treatment Works
Solar Photovoltaics · Operational
7.27.9 km
Frodsham Marsh
Wind Onshore · Operational
50.48.2 km
Native River
Battery · Operational
578.2 km

How big is Gowy Landfill Site, Cheshire (Extension)?

Gowy Landfill Site, Cheshire (Extension) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gowy Landfill Site, Cheshire (Extension)?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gowy Landfill Site, Cheshire (Extension) approved and built?

REPD does not record a submission date. Permission was granted on 1999-10-13. The site became operational on 2000-02-01, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 659.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council