Pant y wal
Pant y wal is an operational 25 MW onshore wind farm in Bridgend, generating since 1 June 2013. Planning permission was granted on 4 May 2011, 61 months after submission. Operator of record: Pennant Wind Energy Ventures (PWEV).
Planning and build timeline
| Application submitted | 31 March 2006 |
| Permission granted | 4 May 2011 61 months after submission |
| Operational | 1 June 2013 25 months after consent |
Screening a site of your own?
Bridgend approves 60% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Pant y wal’s recorded coordinate — swap in your own postcode or coordinates.
Bridgend’s record on onshore wind
Bridgend has decided 10 onshore wind schemes and approved 60%, taking a median of 9.3 months. See every onshore wind scheme decision in Bridgend →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 10 | 0.7 km |
Wind Onshore · Operational | 17.5 | 0.9 km |
Wind Onshore · Under Construction | 1.5 | 3 km |
Wind Onshore · Operational | 20 | 3.1 km |
Landfill Gas · Operational | 2.7 | 5.2 km |
Wind Onshore · Operational | 9 | 5.6 km |
Wind Onshore · Operational | 6.4 | 5.7 km |
Wind Onshore · Operational | 12 | 7 km |
How big is Pant y wal?
Pant y wal has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pant y wal?
REPD records the operator as Pennant Wind Energy Ventures (PWEV). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pant y wal approved and built?
The application was submitted on 31 March 2006. Permission was granted on 4 May 2011, 61 months later. The site became operational on 1 June 2013, 25 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4039.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode