Renewable sites › Little White Alice Solar Park
Little White Alice Solar Park
Little White Alice Solar Park is an operational 1.3 MW solar farm in Cornwall, generating since 30 April 2013. Planning permission was granted on 7 January 2013, 1 months after submission. Operator of record: Little White Alice Ltd.
Planning and build timeline
| Application submitted | 4 December 2012 |
| Permission granted | 7 January 2013 1 months after submission |
| Operational | 30 April 2013 4 months after consent |
Screening a site of your own?
Cornwall approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Little White Alice Solar Park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- World Heritage Site — Cornwall and West Devon Mining Landscape
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 10 | 2.9 km |
Solar Photovoltaics · Operational | 6 | 3.2 km |
Solar Photovoltaics · Operational | 5.3 | 3.9 km |
Solar Photovoltaics · Operational | 8.5 | 5.1 km |
Solar Photovoltaics · Operational | 8.9 | 6.7 km |
Wind Onshore · Operational | 1.7 | 6.7 km |
Hot Dry Rocks (HDR) · Operational | 3 | 8 km |
Landfill Gas · Operational | 3 | 8.3 km |
How big is Little White Alice Solar Park?
Little White Alice Solar Park has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Little White Alice Solar Park?
REPD records the operator as Little White Alice Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Little White Alice Solar Park approved and built?
The application was submitted on 4 December 2012. Permission was granted on 7 January 2013, 1 months later. The site became operational on 30 April 2013, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1098.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode