United Mines Landfill Scheme is operational in Cornwall with a recorded capacity of 3 MW, and has been generating since 1998-11-19.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 1998-11-19
Landfill Gas
Technology
East Midlands Electricity Generation
Cornwall
Authority
England

Planning and build timeline

Application submitted1994-03-03
Permission granted1994-11-29
9 months after submission
Operational1998-11-19
48 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
St Day II
Landfill Gas · Operational
21.2 km
United Downs Project (Geothermal)
Hot Dry Rocks (HDR) · Operational
31.3 km
Wheal Jane
Solar Photovoltaics · Operational
1.43.9 km
Pencoose Farm
Solar Photovoltaics · Operational
8.54.5 km
Gover Farm Solar Park
Solar Photovoltaics · Operational
85.7 km
Four Burrows Wind Farm
Wind Onshore · Operational
4.56.3 km
Four Burrows Farm (Extension 2)
Solar Photovoltaics · Operational
6.36.5 km
Carn Vean
Wind Onshore · Operational
106.6 km

How big is United Mines Landfill Scheme?

United Mines Landfill Scheme has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates United Mines Landfill Scheme?

REPD records the operator as East Midlands Electricity Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was United Mines Landfill Scheme approved and built?

The application was submitted on 1994-03-03. Permission was granted on 1994-11-29, 9 months later. The site became operational on 1998-11-19, 48 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 611.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council