Lindhurst Wind Farm
Lindhurst Wind Farm is operational in Newark and Sherwood with a recorded capacity of 15 MW, and has been generating since 2010-11-04.
Planning and build timeline
| Application submitted | 2006-06-01 |
| Permission granted | 2007-09-21 16 months after submission |
| Operational | 2010-11-04 37 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Newark and Sherwood’s record on onshore wind
Newark and Sherwood has decided 5 onshore wind schemes and approved 60%, taking a median of 15.4 months. See every onshore wind scheme decision in Newark and Sherwood →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land At Debdale Lane Solar Photovoltaics · Operational | 5 | 6.4 km |
Newstead and Annesley Wind Turbine Wind Onshore · Operational | 1.5 | 6.5 km |
Bilsthorpe (Land off Forest Lane) Solar Photovoltaics · Operational | 5 | 7.4 km |
Littlewood Lane Solar Solar Photovoltaics · Operational | 5 | 7.9 km |
Burntstump Landfill Scheme Landfill Gas · Operational | 1.8 | 8.3 km |
Sutton Landfill Site Landfill Gas · Operational | 3 | 8.8 km |
Bilsthorpe Quarry Solar Park Solar Photovoltaics · Operational | 4.8 | 8.9 km |
Cheesecake Energy Air Energy Storage Compressed Air Energy Storage · Operational | — | 8.9 km |
How big is Lindhurst Wind Farm?
Lindhurst Wind Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lindhurst Wind Farm?
REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lindhurst Wind Farm approved and built?
The application was submitted on 2006-06-01. Permission was granted on 2007-09-21, 16 months later. The site became operational on 2010-11-04, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2938.