Lindhurst Wind Farm

Lindhurst Wind Farm is an operational 15 MW onshore wind farm in Newark and Sherwood, generating since 4 November 2010. Planning permission was granted on 21 September 2007, 16 months after submission. Operator of record: Npower Renewables.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 4 November 2010
Wind Onshore
Technology
Npower Renewables
Newark and Sherwood
Authority
England

Planning and build timeline

Application submitted1 June 2006
Permission granted21 September 2007
16 months after submission
Operational4 November 2010
37 months after consent

Screening a site of your own?

RedlineUK · £39

Newark and Sherwood approves 60% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lindhurst Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newark and Sherwood’s record on onshore wind

Newark and Sherwood has decided 5 onshore wind schemes and approved 60%, taking a median of 15.4 months. See every onshore wind scheme decision in Newark and Sherwood

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
56.4 km
Wind Onshore · Operational
1.56.5 km
Solar Photovoltaics · Operational
57.4 km
Solar Photovoltaics · Operational
57.9 km
Landfill Gas · Operational
1.88.3 km
Landfill Gas · Operational
38.8 km
Solar Photovoltaics · Operational
4.88.9 km
Compressed Air Energy Storage · Operational
8.9 km

How big is Lindhurst Wind Farm?

Lindhurst Wind Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lindhurst Wind Farm?

REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lindhurst Wind Farm approved and built?

The application was submitted on 1 June 2006. Permission was granted on 21 September 2007, 16 months later. The site became operational on 4 November 2010, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2938.