Novarly ParcelRenewable sites

Renewable sitesLand At Debdale Lane

Land At Debdale Lane

Land At Debdale Lane is operational in Mansfield with a recorded capacity of 5 MW, and has been generating since 2016-03-25.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-25
Solar Photovoltaics
Technology
Equitix Fund IV
Mansfield
Authority
England

Planning and build timeline

Application submitted2015-07-22
Permission granted2015-10-21
3 months after submission
Operational2016-03-25
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Mansfield’s record on solar

Mansfield has decided 13 solar farms and approved 85%, taking a median of 3 months. See every solar farm decision in Mansfield

Other built sites within 15 km

SiteMWDistance
Littlewood Lane Solar
Solar Photovoltaics · Operational
52.5 km
SPF Thirty Acres Farm
Solar Photovoltaics · Operational
3.85.3 km
Sutton Landfill Site
Landfill Gas · Operational
35.8 km
Lindhurst Wind Farm
Wind Onshore · Operational
156.4 km
Glapwell Power
Landfill Gas · Operational
27.4 km
Glapwell
Landfill Gas · Operational
1.27.7 km
Crow Trees Farm
Solar Photovoltaics · Operational
4.78.1 km
Twin Yards Solar Farm
Solar Photovoltaics · Operational
58.4 km

How big is Land At Debdale Lane?

Land At Debdale Lane has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land At Debdale Lane?

REPD records the operator as Equitix Fund IV. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land At Debdale Lane approved and built?

The application was submitted on 2015-07-22. Permission was granted on 2015-10-21, 3 months later. The site became operational on 2016-03-25, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5401.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council