Burntstump Landfill Scheme
Burntstump Landfill Scheme is operational in Gedling with a recorded capacity of 1.8 MW, and has been generating since 1999-04-15.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1999-04-15 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Gedling
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Dorket Head Landfill Gas · Operational | 2.8 | 2.7 km |
Gedling Solar Farm Solar Photovoltaics · Operational | 5.7 | 6.7 km |
Bulwell Energy Advanced Conversion Technologies · Under Construction | 29.5 | 6.8 km |
Newstead and Annesley Wind Turbine Wind Onshore · Operational | 1.5 | 6.9 km |
Long Lane Solar Farm / Nottingham Brick Works Solar Photovoltaics · Under Construction | 17 | 7.6 km |
Lindhurst Wind Farm Wind Onshore · Operational | 15 | 8.3 km |
Severn Trent Water - Stoke Bardolph Wind Turbine Wind Onshore · Operational | 1.5 | 9.5 km |
Stoke Bardolph energy crop (Farm AD) Anaerobic Digestion · Operational | 2 | 9.7 km |
How big is Burntstump Landfill Scheme?
Burntstump Landfill Scheme has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Burntstump Landfill Scheme?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Burntstump Landfill Scheme approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1999-04-15.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 532.