Planning and build timeline
| Application submitted | 2012-12-05 |
| Permission granted | 2013-08-12 8 months after submission |
| Operational | 2014-11-18 15 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Newark and Sherwood’s record on solar
Newark and Sherwood has decided 25 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in Newark and Sherwood →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cheesecake Energy Air Energy Storage Compressed Air Energy Storage · Operational | — | 0.4 km |
Stonish Hill (Bilsthorpe) Wind Onshore · Operational | 10.3 | 1.2 km |
Eakring Solar Farm Solar Photovoltaics · Operational | 11.9 | 1.6 km |
Stud Farm, Rufford (Farm AD) Anaerobic Digestion · Operational | 2.2 | 1.8 km |
Bilsthorpe (Land off Forest Lane) Solar Photovoltaics · Operational | 5 | 2 km |
Rufford Lane Solar Photovoltaics · Operational | 2.6 | 5.3 km |
Land South Off Ollerton Road Solar Photovoltaics · Operational | 4.2 | 5.4 km |
Lindhurst Wind Farm Wind Onshore · Operational | 15 | 8.9 km |
How big is Bilsthorpe Quarry Solar Park?
Bilsthorpe Quarry Solar Park has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bilsthorpe Quarry Solar Park?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bilsthorpe Quarry Solar Park approved and built?
The application was submitted on 2012-12-05. Permission was granted on 2013-08-12, 8 months later. The site became operational on 2014-11-18, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2378.