Cheesecake Energy Air Energy Storage

Cheesecake Energy Air Energy Storage is operational in Newark and Sherwood, and has been generating since 2021-09-25.

Capacity
as recorded in REPD
Operational
Status
since 2021-09-25
Compressed Air Energy Storage
Technology
Via East Midlands Limited
Newark and Sherwood
Authority
England

Planning and build timeline

Application submitted2020-11-26
Permission granted2021-01-19
2 months after submission
Operational2021-09-25
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bilsthorpe Quarry Solar Park
Solar Photovoltaics · Operational
4.80.4 km
Stonish Hill (Bilsthorpe)
Wind Onshore · Operational
10.31 km
Eakring Solar Farm
Solar Photovoltaics · Operational
11.91.3 km
Stud Farm, Rufford (Farm AD)
Anaerobic Digestion · Operational
2.21.4 km
Bilsthorpe (Land off Forest Lane)
Solar Photovoltaics · Operational
52.3 km
Rufford Lane
Solar Photovoltaics · Operational
2.64.9 km
Land South Off Ollerton Road
Solar Photovoltaics · Operational
4.25.1 km
Lindhurst Wind Farm
Wind Onshore · Operational
158.9 km

How big is Cheesecake Energy Air Energy Storage?

REPD does not record an installed capacity for Cheesecake Energy Air Energy Storage.

Who operates Cheesecake Energy Air Energy Storage?

REPD records the operator as Via East Midlands Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cheesecake Energy Air Energy Storage approved and built?

The application was submitted on 2020-11-26. Permission was granted on 2021-01-19, 2 months later. The site became operational on 2021-09-25, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8173.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council