Lincoln Landfill Scheme

Lincoln Landfill Scheme is an operational 2 MW landfill gas site in North Kesteven, generating since 6 June 2000. Planning permission was granted on 8 December 1994, 3 months after submission. Operator of record: Natural Power.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 6 June 2000
Landfill Gas
Technology
Natural Power
North Kesteven
Authority
England

Planning and build timeline

Application submitted14 September 1994
Permission granted8 December 1994
3 months after submission
Operational6 June 2000
66 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Kesteven: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lincoln Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
16.40.3 km
Battery · Operational
107.6 km
Solar Photovoltaics · Operational
18.99.2 km
Biomass (dedicated) · Under Construction
1.69.3 km
Solar Photovoltaics · Under Construction
409.7 km
Biomass (dedicated) · Under Construction
1.610.4 km
Anaerobic Digestion · Operational
6.511.6 km
Biomass (dedicated) · Operational
1212.7 km

How big is Lincoln Landfill Scheme?

Lincoln Landfill Scheme has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lincoln Landfill Scheme?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lincoln Landfill Scheme approved and built?

The application was submitted on 14 September 1994. Permission was granted on 8 December 1994, 3 months later. The site became operational on 6 June 2000, 66 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 741.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode