Renewable sites › Metheringham Heath (Farm AD)
Metheringham Heath (Farm AD)
Metheringham Heath (Farm AD) is operational in North Kesteven with a recorded capacity of 6.5 MW, and has been generating since 2017-03-30.
Planning and build timeline
| Application submitted | 2014-01-21 |
| Permission granted | 2014-06-11 5 months after submission |
| Operational | 2017-03-30 34 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Branston solar park Solar Photovoltaics · Operational | 18.9 | 5.3 km |
Branston Solar Park (extension) Solar Photovoltaics · Under Construction | 40 | 5.6 km |
Castle Farm, Castle Lane - Biomass Boiler & Agricultural Building Biomass (dedicated) · Under Construction | 1.6 | 6.9 km |
Skinnand Manor Farm, Parsons Lane - Biomass Boiler Biomass (dedicated) · Under Construction | 1.6 | 8.3 km |
Lincoln Landfill Scheme Landfill Gas · Operational | 2 | 11.6 km |
Lincoln EFW EfW Incineration · Operational | 16.4 | 11.6 km |
Fiskerton Airfield (Phase 1) Solar Photovoltaics · Operational | 12 | 12.6 km |
Fiskerton Airfield (Phase 2) Solar Photovoltaics · Operational | 22 | 12.6 km |
How big is Metheringham Heath (Farm AD)?
Metheringham Heath (Farm AD) has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Metheringham Heath (Farm AD)?
REPD records the operator as Future Biogas (Blankney Estate). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Metheringham Heath (Farm AD) approved and built?
The application was submitted on 2014-01-21. Permission was granted on 2014-06-11, 5 months later. The site became operational on 2017-03-30, 34 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 331.