Novarly ParcelRenewable sites

Renewable sitesLilford Hall, Lilford - Solar Panels

Lilford Hall, Lilford - Solar Panels

Lilford Hall, Lilford - Solar Panels is under construction in North Northamptonshire with a recorded capacity of 1 MW.

1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Lilford Hall Estate
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2022-12-13
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on solar

North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Colpmans Farm
Solar Photovoltaics · Operational
56.6 km
Weldon Phase 1 and 2
Landfill Gas · Operational
412 km
Cranford
Landfill Gas · Operational
1.112.6 km
Burton Wold Windfarm
Wind Onshore · Operational
2014.1 km
Burton Wold Wind Farm - Northern Extension
Wind Onshore · Operational
14.414.5 km
Jacksons Bakery - Solar Panels
Solar Photovoltaics · Under Construction
0.6314.8 km
Chelveston Renewable Energy Park
Battery · Under Construction
2014.9 km

How big is Lilford Hall, Lilford - Solar Panels?

Lilford Hall, Lilford - Solar Panels has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lilford Hall, Lilford - Solar Panels?

REPD records the operator as Lilford Hall Estate. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lilford Hall, Lilford - Solar Panels approved and built?

The application was submitted on 2022-12-13. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12947.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council