Chelveston Renewable Energy Park
Chelveston Renewable Energy Park is a 20 MW battery storage site under construction in North Northamptonshire. Planning permission was granted on 10 May 2018, 13 months after submission. Operator of record: Federal Estates.
Planning and build timeline
| Application submitted | 20 April 2017 |
| Permission granted | 10 May 2018 13 months after submission |
| Operational | not recorded |
Screening a site of your own?
North Northamptonshire approves 80% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Chelveston Renewable Energy Park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Northamptonshire’s record on battery storage
North Northamptonshire has decided 10 battery storage schemes and approved 80%, taking a median of 4.8 months. See every battery storage scheme decision in North Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 10 | 0.6 km |
Solar Photovoltaics · Operational | 19.5 | 0.8 km |
Solar Photovoltaics · Operational | 16 | 1 km |
Wind Onshore · Operational | 12.5 | 1.1 km |
Solar Photovoltaics · Operational | 3.5 | 1.2 km |
Anaerobic Digestion · Operational | 2 | 5.8 km |
Solar Photovoltaics · Operational | 15 | 7.6 km |
Landfill Gas · Operational | 2.4 | 8.6 km |
How big is Chelveston Renewable Energy Park?
Chelveston Renewable Energy Park has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Chelveston Renewable Energy Park?
REPD records the operator as Federal Estates. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Chelveston Renewable Energy Park approved and built?
The application was submitted on 20 April 2017. Permission was granted on 10 May 2018, 13 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6941.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode