Weldon Phase 1 and 2

Weldon Phase 1 and 2 is an operational 4 MW landfill gas site in North Northamptonshire, generating since 15 June 2002. Planning permission was granted on 12 June 1997, 12 months after submission. Operator of record: Waste Recycling Group.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 June 2002
Landfill Gas
Technology
Waste Recycling Group
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted5 June 1996
Permission granted12 June 1997
12 months after submission
Operational15 June 2002
60 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Northamptonshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Weldon Phase 1 and 2’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.632.8 km
Wind Onshore · Operational
14.48.7 km
Solar Photovoltaics · Operational
510.6 km
Solar Photovoltaics · Operational
20.511.4 km
Anaerobic Digestion · Operational
1.511.8 km
Solar Photovoltaics · Operational
411.9 km
Solar Photovoltaics · Under Construction
112 km
Landfill Gas · Operational
1.112.3 km

How big is Weldon Phase 1 and 2?

Weldon Phase 1 and 2 has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Weldon Phase 1 and 2?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Weldon Phase 1 and 2 approved and built?

The application was submitted on 5 June 1996. Permission was granted on 12 June 1997, 12 months later. The site became operational on 15 June 2002, 60 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 538.