Novarly ParcelRenewable sites

Renewable sitesCranford

Cranford

Cranford is operational in North Northamptonshire with a recorded capacity of 1.1 MW, and has been generating since 2006-12-01.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-12-01
Landfill Gas
Technology
SITA UK
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2006-03-29
Permission granted2006-04-19
1 months after submission
Operational2006-12-01
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Burton Wold Windfarm
Wind Onshore · Operational
201.8 km
Burton Wold Wind Farm - Northern Extension
Wind Onshore · Operational
14.42 km
Burton Wold Wind Farm South
Wind Onshore · Operational
7.52.9 km
Colpmans Farm
Solar Photovoltaics · Operational
55.9 km
Sidegate Lane
Landfill Gas · Operational
2.46.1 km
Sidegate Lane Landfill Site
Landfill Gas · Operational
1.36.1 km
Little Irchester, Higham Road Solar Farm
Solar Photovoltaics · Operational
4.69.7 km
Fernbrook AD Plant (Waste AD)
Anaerobic Digestion · Operational
1.59.9 km

How big is Cranford?

Cranford has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cranford?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cranford approved and built?

The application was submitted on 2006-03-29. Permission was granted on 2006-04-19, 1 months later. The site became operational on 2006-12-01, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 757.