Renewable sites › Burton Wold Wind Farm - Northern Extension
Burton Wold Wind Farm - Northern Extension
Burton Wold Wind Farm - Northern Extension is an operational 14.4 MW onshore wind farm in North Northamptonshire, generating since 1 August 2014. Planning permission was granted on 9 November 2012, 2 months after submission. Operator of record: John Laing Environmental Assets Group.
Planning and build timeline
| Application submitted | 29 August 2012 |
| Permission granted | 9 November 2012 2 months after submission |
| Operational | 1 August 2014 21 months after consent |
Screening a site of your own?
North Northamptonshire approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Burton Wold Wind Farm - Northern Extension’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Northamptonshire’s record on onshore wind
North Northamptonshire has decided 9 onshore wind schemes and approved 67%, taking a median of 4.7 months. See every onshore wind scheme decision in North Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 20 | 0.6 km |
Wind Onshore · Operational | 7.5 | 0.9 km |
Landfill Gas · Operational | 1.1 | 2 km |
Landfill Gas · Operational | 2.4 | 4.3 km |
Landfill Gas · Operational | 1.3 | 4.3 km |
Solar Photovoltaics · Operational | 5 | 7.9 km |
Solar Photovoltaics · Operational | 4.6 | 8 km |
Solar Photovoltaics · Operational | 26 | 9.3 km |
How big is Burton Wold Wind Farm - Northern Extension?
Burton Wold Wind Farm - Northern Extension has a recorded installed capacity of 14.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Burton Wold Wind Farm - Northern Extension?
REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Burton Wold Wind Farm - Northern Extension approved and built?
The application was submitted on 29 August 2012. Permission was granted on 9 November 2012, 2 months later. The site became operational on 1 August 2014, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4210.
Novarly Parcel · official public data, read properly · parcel.novarly.com