Colpmans Farm is operational in North Northamptonshire with a recorded capacity of 5 MW, and has been generating since 2012-04-17.
Planning and build timeline
| Application submitted | 2011-01-19 |
| Permission granted | 2011-05-27 4 months after submission |
| Operational | 2012-04-17 11 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Northamptonshire’s record on solar
North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cranford Landfill Gas · Operational | 1.1 | 5.9 km |
Lilford Hall, Lilford - Solar Panels Solar Photovoltaics · Under Construction | 1 | 6.6 km |
Burton Wold Windfarm Wind Onshore · Operational | 20 | 7.5 km |
Burton Wold Wind Farm - Northern Extension Wind Onshore · Operational | 14.4 | 7.9 km |
Burton Wold Wind Farm South Wind Onshore · Operational | 7.5 | 8.7 km |
Weldon Phase 1 and 2 Landfill Gas · Operational | 4 | 10.6 km |
Chelveston Renewable Energy Park Battery · Under Construction | 20 | 10.8 km |
Chelveston Renewable Energy Park Wind Farm (Bedford) Wind Onshore · Operational | 10 | 11 km |
How big is Colpmans Farm?
Colpmans Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Colpmans Farm?
REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Colpmans Farm approved and built?
The application was submitted on 2011-01-19. Permission was granted on 2011-05-27, 4 months later. The site became operational on 2012-04-17, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1339.