Burton Wold Windfarm is an operational 20 MW onshore wind farm in North Northamptonshire, generating since 1 April 2006. Planning permission was granted on 23 March 2004, 0 months after submission. Operator of record: Gravis Capital Management.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2006
Wind Onshore
Technology
Gravis Capital Management
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted23 March 2004
Permission granted23 March 2004
0 months after submission
Operational1 April 2006
24 months after consent

Screening a site of your own?

RedlineUK · £39

North Northamptonshire approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Burton Wold Windfarm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on onshore wind

North Northamptonshire has decided 9 onshore wind schemes and approved 67%, taking a median of 4.7 months. See every onshore wind scheme decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
14.40.6 km
Wind Onshore · Operational
7.51.2 km
Landfill Gas · Operational
1.11.8 km
Landfill Gas · Operational
2.44.3 km
Landfill Gas · Operational
1.34.3 km
Solar Photovoltaics · Operational
57.5 km
Solar Photovoltaics · Operational
4.68 km
Solar Photovoltaics · Operational
269.3 km

How big is Burton Wold Windfarm?

Burton Wold Windfarm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burton Wold Windfarm?

REPD records the operator as Gravis Capital Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burton Wold Windfarm approved and built?

The application was submitted on 23 March 2004. Permission was granted on 23 March 2004, 0 months later. The site became operational on 1 April 2006, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4672.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode