Renewable sitesLand To The South Of Todderstaffe

Land To The South Of Todderstaffe

Land To The South Of Todderstaffe is operational in Fylde with a recorded capacity of 4.5 MW, and has been generating since 2017-03-28.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-28
Solar Photovoltaics
Technology
Solar Power Inc UK Services/SPI China (HK)
Fylde
Authority
England

Planning and build timeline

Application submitted2015-06-18
Permission granted2015-11-17
5 months after submission
Operational2017-03-28
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fylde’s record on solar

Fylde has decided 14 solar farms and approved 86%, taking a median of 4.3 months. See every solar farm decision in Fylde

Other built sites within 15 km

SiteMWDistance
Weeton Barracks, Grantham Road - Solar Panels
Solar Photovoltaics · Under Construction
0.71.3 km
Staining Wood Farm
Solar Photovoltaics · Operational
4.94.8 km
Land off Moss Side Lane
Solar Photovoltaics · Operational
55.8 km
Thornton Power Station
Biomass (dedicated) · Operational
96.9 km
Cooper House Farm
Solar Photovoltaics · Operational
58.5 km
Carr Farm (Farm AD)
Anaerobic Digestion · Operational
18.6 km
Thornton Waste Recovery Park (Waste AD)
Anaerobic Digestion · Operational
1.98.7 km
Jameson Road
Landfill Gas · Operational
4.39.6 km

How big is Land To The South Of Todderstaffe?

Land To The South Of Todderstaffe has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land To The South Of Todderstaffe?

REPD records the operator as Solar Power Inc UK Services/SPI China (HK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land To The South Of Todderstaffe approved and built?

The application was submitted on 2015-06-18. Permission was granted on 2015-11-17, 5 months later. The site became operational on 2017-03-28, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5486.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council